This project, titled 2023 Typhoon Koinu Post-Disaster Repairs – Wetland Park Waterfront Boardwalk Renovation, involves restoring the waterfront boardwalk at Wetland Park. The original materials used were Southern Pine.
Due to the impact of Typhoon Koinu, the existing wooden boardwalk and railing panels have suffered damage, including detachment and collapse, posing significant safety concerns.
Remove the existing landscape and construct new reinforced concrete (RC) foundations.
Install the base beams for the wooden boardwalk (hollow columns). To ensure a level walking surface, the columns are cut to appropriate heights based on the uneven terrain.
All materials are pre-treated with protective wood paint to enhance durability and
extend their lifespan.
The railing posts are integrated with the base beam columns and secured to the RC foundation,
providing greater stability to the railings.
Install the base beams for the wooden boardwalk (longitudinal and crossbars).
Install the wooden boardwalk panels and apply protective wood paint.
Completed Project Photos